Kopu Bridge design ready to start

Work begins this weekend on designing a replacement for the Kopu Bridge outside Thames.

Transit New Zealand says it will begin geotechnical investigations of the Waihou River as it prepares to start designing a two-lane bridge.

Transit Hamilton project manager John Hannah says the 500m-long bridge will be built slightly
upstream from the existing one with 2.4km of associated road works.