How the drama unfolded

A webcam captures the wall of mud and water in the Whangaehu Valley. Photo Supplied.
A webcam captures the wall of mud and water in the Whangaehu Valley. Photo Supplied.

KEY POINTS:

    How the drama unfolded:

    10.06am:

    One of three DOC sensors at Crater Lake registers unusual earth vibrations.

    10.42am:

    The same sensor sounds another warning

    10.50am:

    The same sensor repeats another warning

    11.00am: (Approximation)

    The other two sensors at Crater Lake start sounding. The lahar
    is thought to began to occur at this point, over a period of about 45 minutes.

    12.00pm:

    Police announce closure of SH1 between Rangipo and Waiouru. SH49 between Waiouru and Ohakune is also closed. All rail services stopped at Waiouru and Ohakune.

    12.45pm: (Approximation)

    DOC sensors return to their normal background reading.

    1.00pm (Approximation)

    Whangaehu River levels peak just after 1.

    3.55pm:

    SH1 between Rangipo and Waiouru reopened.

    4.29pm:

    SH49 between Waiouru and Ohakune reopened

    4.30pm:

    Tangiwai rail bridge reopened subject to a 25 kph speed limit